10/2/2023 0 Comments Log flume ride valentines![]() Over the last 4 miles, the flume was built along the cliff side of the Columbia River. The flume descended a total elevation of about 1000 feet over its nine-mile course and at some points was over 80 feet off of the ground. At the end of this blog, you will see time lapse photos showing the deterioration of the flume. The flume was a money saver for many years because it solved the problem of transporting the lumber down a 13-mile winding road by truck.Īs you read thru this article, you will see pictures of the flume in different stages of its life. In a few places (road crossings), the flume was made of metal (3/8 inch steel plates welded together). The flume was v-shaped on the bottom and the water ran about 2-feet deep. ![]() Cedar lumber was used for the legs and supports because it was rot resistant. The 2 x 14" boards were 2 inches thick which made the troughs tough and strong. ![]() The flume was constructed out of 16-foot long 2 x 14" tongue & groove Douglas fir boards. The flume transported about 130,000 to 150,000 board feet/day. Since the flume was nine miles long, it took 55 minutes for a piece of lumber to make the trip from the Willard Mill to the Hood Mill. The flume water originated at the Little White Salmon River and flowed downhill at a rate of approximately 9 miles/hour. Broughton purchased the flume and right-of-ways in 1923. When the flume ran across a private residence, it was initially leased. This extended the flume length to the full 9 miles and ended at the Hood mill (near Underwood). A second flume was constructed between 19. The first part of the flume was built in 1913 and ended at Drano Lake. The Broughton lumber flume was a 9-mile wooden trough that transported rough- sawn timber (cants) from a lumber mill in Willard, WA to a finishing mill in Hood, WA. It is managed by Athena Properties Limited.Ĭhinese company AVIC International is the developer of the project.It Was the Last Working Flume in USA and it's Almost Gone Two Rivers is co-owned by Centum Group that controls a 58 per cent stake, AVIC International (38 per cent) and the Industrial and Commercial Development Corporation (ICDC) (14 per cent). Stores unique to Two Rivers are Magic Planet (Leisure & Lifestyle), LC Waikiki (Fashion/Apparel), Villeroy & Bosch (Home Zone), Swarovski (Jewelery & Accessories), Anmol Jewellers (Jewelery & Accessories) and Azadea TA Cool Trends (Fashion/Apparel).Īccording to the company, the developers have also created a unique riverfront experience adjacent to the mall, which includes dancing fountains as well as a theme park comprising activities that include a flume ride, bumper boats, water zorbing and a water park. There are over 18 food and beverage outlets, 9 banks, 38 fashion and apparel stores, and 13 health and beauty stores. The mall is the anchor project in the broader Two Rivers development, which will ultimately comprise residential, commercial, retail, MICE and hospitality offerings within this 100 acre precinct. The mall fits into Centum Group’s overarching strategy within their real estate portfolio to develop new urban nodes, implying the development of large scale mixed use precincts, complete with the necessary infrastructure such as power and water. It is these 120 tenants that have buoyed the company to finally settle on the opening date.ġ00 Stores currently fitting out and anticipated to open on 14 February 2017 include Chandarana Food Plus, Carrefour, LC Waikiki, Deacons Group (Adidas, Bossini, Mr Price Home, Mr Price Apparel), Villeroy & Bosch, Magic Planet, Swarovski, Anmol Jewellers, Woolworth, Azadea TA Cool Trends, Secret Garden, Burger King, Artcaffe, Text Book Centre, Coffee Nove, Urban Gourmet, Barclays Bank, Kenya Commercial Bank, Standard Chartered Bank, Sidian Bank, Coop Bank & Stanbic Bank amongst others. Two Rivers has 188 stores available to let with over 120 tenants who have either completed fit outs or are currently fitting out. Two Rivers Mall gross lettable area was scaled up from 40,000 m2 to 67,000 m2 and as a result, due to the additional build, we had to postpone the opening dates of the centre, read a statement from the company on inquiry. The mall, the biggest in East and Central Africa has had several delays in what the company attributed to need ‘to assert our dominance in the market.’ The grand launch is also slated for February 17, 2017. Centum’s Two Rivers is finally set for opening on Februas the management affirmed that there will be no more postponements.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |